Yesterday, we visited with the President of ‘Diputación de Alicante’, César Sánchez Pérez, the progress of the works of the new well called ‘Corralet’ in Benigembla.
We used to say: ‘drilling by percussion is an art’. It takes months of work, but the result, such as is happening now, is water wells very well builded and with great information about the perforated litological materials. For that, it is need good perforists / sondists and a meticulous works management.
Below, several pictures of the works in Benigembla and the geological well log, made by our technicians of Hydrologic Cycle as drilling progresses.